Case study · With Fletcher Construction
NZ International Convention Centre: a $21M remediation package in Auckland
- Value
- $21M remediation package on a $1B project
- Delivery
- Design and build
- Subcontractors
- Six
- Location
- Auckland
The challenge
A $21M remediation package inside a $1B design and build project in Auckland, with six subcontractors claiming every month.
What was done
- Responsible for the $21M remediation package
- Certified subcontractor claims of up to $1.5M a month across six subcontractors
The result
$21M
package managed
$1.5M
a month in subcontractor claims certified
~$500K
of savings
Delivered in an earlier role with Fletcher Construction, not as a CMPC engagement.
What this means for your project
- Check every subcontractor claim against the work actually done, every month
- Keep one register of variations across all subcontractors, so nothing is paid twice
- Report cost to complete on the package, not just cost to date
Book a free 30 minute call (opens in a new tab)
Reply within one business day.