Free · Word template
Extension of Time Claim Template (NZS 3910:2023)
An extension of time claim under NZS 3910:2023 is two notices: what happened, sent within 20 working days of becoming aware, and the period you seek. This Word template sets out both, with the clause reference beside each part, so you fill in the facts instead of starting from a blank page.
What's inside
- Notice 1, the circumstances: who it goes to, the date you became aware, the seven grounds to tick, what happened and how you are reducing the delay
- Notice 2, the period sought: effect on the critical path, float, the new completion date, time-related costs and concurrent delays
- A list of the records to attach, and short notes on what the Independent Certifier looks at
Where should we send it?
It arrives by email straight away.
This is a general guide based on NZS 3910:2023. NEC, FIDIC and NZS 3916 contracts have different steps and time limits, and special conditions can change these, so check your own contract.
Want your own claims and notices checked? Payment Claim Health Check →